ENERGY ADVISORY · PROJECT FINANCE · INDUSTRIAL DECARBONISATION

Lower energy costs. Invest with confidence.

Compare solar PV, battery storage and PPA options against your facility’s load, operating needs and investment criteria. Technical, commercial and financial assessment for industry, mining and IPPs in Indonesia.

Independent energy advisory · Solar PV · BESS · PPA · Project finance  |  13 decision tools  |  English & Bahasa Indonesia  |  Surabaya, Indonesia

Start with the decision your business needs to make.

02

Operational reliability

Define critical loads, operating constraints and the role of storage before choosing a system.

Discuss reliability needs →
FOUNDER-LED ADVISORY

Advice from someone who has negotiated the deals.

FOUNDER

Ahmad Muhaimin Rasyid

Known as GUSSMUH

Founder, SUN Powerindo · Senior Business Development Manager, SUN Energy

More than 10 years in industrial B2B and renewable energy. He works where decarbonisation, project economics and investment decisions meet: origination, PPA structuring, risk approval and delivery for industrial and mining companies across Indonesia.

150+ MWprenewable pipeline originated
70+ MWpcontracts negotiated, 2023–2026
50+ MWpoperational capacity contributed
25 yearsPPA tenors negotiated with C-level buyers

Founder's track record at SUN Energy. SUN Powerindo operates independently of his employment.

Explore facility references and decision studies.

Facility references

Facility references

Explore three public facility references, with stated involvement, capacity basis and links to published context.

View facility references →
Decision studies

Decision studies

Review the questions, data and assessment methods behind technical and commercial decisions.

Explore decision studies →
Illustrative models

Illustrative models

Explore synthetic scenarios. Model results describe assumptions; they are not measured client outcomes.

Review model assumptions →
Existing facility documentation: Jayamas Medica (OMED)

Jayamas Medica (OMED)

Facility documentation; involvement follows the published reference.

Existing facility documentation: Amerta Indah Otsuka Kejayan

Amerta Indah Otsuka Kejayan

Facility documentation; involvement follows the published reference.

Existing facility documentation: Indocement Tarjun

Indocement Tarjun

Facility documentation; involvement follows the published reference.

ENERGY INTELLIGENCE / SUN POWERINDO

Three configurations. One informed energy decision.

Compare on-grid, off-grid and hybrid systems. Follow the power, understand the controls and identify the right questions for your facility.

Solar PV

Battery storage

PLN grid

↓ AC bus · coordinated power flow ↓
INDUSTRIAL FACILITY
1,000 kW
Constant illustrative demand
From system options to an actionable project.
Engineering & feasibilityPPA & investment appraisalDevelopment & EPC coordination
Discuss Your Project →

Illustrative AC-coupled topology and instantaneous power at the AC bus; not live monitoring or a savings forecast. Battery charge, power ratings and conversion losses are not modelled. Backup requires suitable grid-forming equipment, isolation, protection and an agreed critical-load design.

Three starting points for energy decisions.

Advanced models use the existing free member account. Register once, verify your email and reuse the same sign-in. Optional activity consent does not determine access.

A defined first step.

Energy Opportunity Review

A document-based review for one facility, with scope, fees and timing agreed in writing.

  • Three months of electricity bills and operating hours
  • Initial solar PV and efficiency screening
  • Indicative CAPEX/PPA comparison and sensitivities
  • Management summary, data gaps and one online discussion

USD 500 / facility

Review scope & request an assessment →

Indicative existing service price. Taxes and additional work are confirmed in the written offer. Detailed engineering, site visits, formal audits and specialist assurance require a separate scope.

Deliverable outline

What a management summary can contain

Decision to assess → data and assumptions → options compared → financial sensitivities → data gaps → next action. This is a deliverable outline, not an actual client report.

01 · Decision & assumptions
02 · Options & sensitivities
03 · Data gaps & next action

Try a simple solar screening.

Explore annual generation and simple payback without an account. Adjust every assumption to your site.

Illustrative, unfinanced screening. Excludes O&M, tax, degradation, replacement, export revenue, time value of money and financing. Self-consumption needs a load-profile assessment. No data is sent or saved.

Compare advanced member scenarios →
What should I prepare?

Your facility type, operating pattern, recent electricity bills and main decision question. Interval load data helps assess solar matching and storage.

Who delivers the project?

SUN Powerindo’s advisory and coordination role follows the agreed scope. EPC delivery, specialist design and approvals belong to the responsible parties appointed for the project.

Bring your facility. Clarify your next decision.

Share your sector, facility location and the decision you need to make. Agree the scope and suitable channel before sharing confidential files.

Discuss your project →

Prefer a short conversation?

Start on WhatsApp →

Your project development journey

  • 01 · Define requirements

    Review your load profile, facility location and business priorities to frame the project.

  • 02 · Compare providers

    Match your requirements with relevant developers and explore suitable collaboration structures.

  • 03 · Assess commercial options

    Compare capital expenditure, power purchase agreements and proposal assumptions to support investment decisions.

  • 04 · Support project coordination

    Align management decisions, coordinate stakeholders and follow up within the agreed scope.